(972) 359-1553
Blackland Prairie ranchland with bluebonnets

Melissa

Growth Along US 75 and SH 121

Melissa sits where SH 121 leaves US 75 and heads northeast. Two decades of highway work on those corridors, plus the Collin County Outer Loop and SH 5, set the stage for the city's growth from 1,350 people in 2000 to about 30,000 in 2025.

Updated October 20265 min read26 sources

Washington County. Photo: William L. Farr, CC BY-SA 4.0

The corridors in brief

  • US 75 (Central Expressway) is the main north to south freeway between Dallas and Sherman. It runs along Melissa's west side.
  • SH 121 comes up from the west as the Sam Rayburn Tollway, runs with US 75 north from McKinney, and then splits off at Melissa toward Bonham as a free highway known locally as the Sam Rayburn Highway.
  • SH 5 (McKinney Street) is the older parallel route through the center of Melissa.
  • The Collin County Outer Loop crosses the north side of the city between US 75 in Anna and SH 121.

A note on the Sam Rayburn Tollway

The Sam Rayburn Tollway is often described as being "extended" toward Melissa, but its tolled main lanes end at US 75 in McKinney. North of that point SH 121 runs with US 75, and through Melissa it is a free, non-tolled state highway. Along the tollway itself, SH 121 is the name of the free frontage roads; the North Texas Tollway Authority (NTTA) operates the main lanes. NTTA began adding a fourth lane in each direction on about 26 miles of the tollway, from Denton Tap Road in Lewisville to east of US 75 in McKinney, in January 2019, a $200 million project.

Road projects that shaped Melissa

Project Limits Scope Years Cost
US 75 widening Telephone Road (CR 275) to north of Melissa Road 4 to 6 lanes, two-lane frontage roads each direction, new interchange at SH 121 (north) Construction let August 2012, completed December 2017 $101.3 million total
Collin County Outer Loop, Segment 1 US 75 in Anna to SH 121 near Melissa First (northern) frontage road Opened 2012 $21 million
SH 121 upgrade Melissa to the Collin and Fannin county line Upgrade to a four-lane divided highway Work began 2016 Not published in source
SH 5 widening SH 121 to north of the Collin County Outer Loop 2-lane rural highway to 4-lane urban roadway Began July 2023; TxDOT listed October 2026 as the completion month and reported 65% complete in early 2026 $42.8 million
US 75 "Last Mile" North of CR 370 in Anna to the Grayson County line 4 to 6 lanes, one-way frontage roads, rebuilt Mantua Road bridge Completed July 2026 $80 million
US 75 improvements I-635 to SH 121 in McKinney Highway improvements Began March 2024; 95% complete in TxDOT's early 2026 report, against a June 2026 completion date $157.4 million
Outer Loop, Segment 3 Denton County line in Celina to US 75 in Anna Frontage road Reached US 75 November 2025; final 3 miles (3A) scheduled for 2026
FM 545 (East Melissa Road) SH 121 to CR 416 Staged widening to 4 lanes, ultimately 6, with 10-foot shared-use paths Public meeting July 30, 2026; construction schedule not yet published Not yet published

What these projects changed

  • The 2012 to 2017 US 75 rebuild through Melissa gave the city continuous frontage roads and a modern SH 121 interchange. That interchange is now the city's largest commercial node.
  • The SH 5 widening turns the old two-lane route north of SH 121 into a four-lane urban street up to and past the Outer Loop.
  • The Outer Loop frontage road, now connected west to Celina, gives Melissa an east to west route across northern Collin County that does not depend on US 380.
  • FM 545 is the next major project for the east side, where acreage and new subdivisions meet. TxDOT's plans call for a raised median and shared-use paths in the ultimate build.

Future Outer Loop segments include Segment 5, from SH 121 near Melissa to US 380 near Farmersville, where Collin County is still determining right-of-way.

Texas bluebonnets
Gonzales County. Photo: William L. Farr, CC BY-SA 4.0

Population growth

Year Population Source
1990 557 Census
2000 1,350 Census
2010 4,695 Census
2020 13,901 Census
2024 26,194 Census estimate (July 1)
2025 29,969 Census estimate (July 1)

Melissa grew 10.0% from mid-2023 to mid-2024, ranking 11th among U.S. cities of 20,000 or more. From mid-2024 to mid-2025 it grew 14.5%, ranking 4th, behind Celina, Fulshear and Princeton. Collin County as a whole added 42,966 residents in that year, second in the nation in numeric growth.

Commercial development

Large retailers arrived after the population did, and most have clustered on the two highway corridors.

Development Location Opened or expected Size
Buc-ee's 1550 Central Expressway (US 75) April 29, 2019 More than 50,000 sq ft, nearly 100 fuel pumps
Kroger Marketplace SH 121 at Washington Drive October 2024 About 123,000 sq ft on about 20 acres
H-E-B 1230 Central Expressway (US 75 at SH 121) May 14, 2025 136,000 sq ft, with True Texas BBQ and fuel station
Walmart Supercenter 1950 McKinney Street (SH 5), near SH 121 November 5, 2025 More than 201,000 sq ft
Chick-fil-A 1300 Melissa Crossing Court, near US 75 and SH 121 June 18, 2026 Listed with 120 employees in the city's FY27 budget
Chipotle Mexican Grill 1220 Melissa Crossing Court 2026 (finish-out registered for December 2025 to March 2026) Restaurant in a new shell building
The Summit at Melissa Crossing, Building 7 2220 Central Expressway (US 75) Construction registered for April 2026 to June 2027 New shell building, about $2 million
Melissa Park Village (X Capital) Northeast corner of SH 121 and Melissa Road First buildings expected 2027 22 acres: 36,000 sq ft retail, 23,000 sq ft office and retail, future apartments

The city's budgets show the effect on its tax base and employment:

  • Total taxable value reached $4.587 billion in 2025, up about 13.7% from 2024, and $5.009 billion for tax year 2026, up 9.18%, mainly from new construction (FY2026 and FY27 budgets).
  • Retailers and restaurants hold five of the nine places on the FY27 budget's top-employer list: H-E-B (600 employees), Buc-ee's (315), Walmart (300), Kroger (164) and Chick-fil-A (120). Melissa ISD (1,163), two concrete firms, Redden Concrete (450) and Beam Construction (350), and the City of Melissa (157) fill the rest.
  • The FY27 budget projects about $12.1 million in total sales tax for the year, about 10% more than the prior year, and notes that retail growth has diversified a base once concentrated in building materials.
  • The combined sales tax rate is 8.25%, with city shares dedicated to general operations, economic development, crime control and fire control.

What to watch

  • Completion of the SH 5 widening north of SH 121 (TxDOT's listed completion month was October 2026)
  • TxDOT's schedule for FM 545 after the July 2026 public meeting
  • The November 3, 2026 Collin County bond election, whose Proposition B would authorize $475 million for non-tolled county roads and bridges
  • Further Outer Loop segments east of SH 121
  • The District 46 street reconstruction in the original town, scheduled from October 2026 to fall 2027
  • Build-out of Melissa Crossing Court, Melissa Park Village and retail at the H-E-B and Walmart corners
Sources (26)

Last reviewed October 2026. See something out of date? Email info@grisak.com.

Keep exploring

More of the Melissa guide

Questions about Melissa?

The Grisak Group has helped buyers and sellers across Collin County for more than two decades. Call, email or stop by the office in Allen.